Home / Our Plants
Our plants

Our Plants and Cluster Model

Juno Joule is investing ₹700 crores to establish 10 high-efficiency CBG plants in Telangana. Our units are strategically located in agricultural districts specifically Siddipet, Nalgonda, and Sangareddy to stay close to feedstock sources.

The Cluster Advantage

Unlike isolated projects, our 10-unit cluster model is designed to create a concentrated network of energy production. This allows us to

Reliable Supply

Concentrating 10 units within a ~150 km radius ensures we can maintain a steady fuel supply for industrial buyers.

Efficient Logistics

By sourcing feedstock within a 25–30 km radius of each plant, we keep transport costs low and minimize our carbon footprint.

Infrastructure Synergy

Clustering allows us to establish centralized pipeline connectivity directly into the Bhagyanagar Gas Limited (BGL) network.

Plant Snapshots

Transforming locally available resources into scalable, clean energy solutions with global impact.

Location
Siddipet, Telangana, India
Sustainability
Every unit is a White Category, Zero Liquid Discharge (ZLD) facility.
Capacity
10 Tons Per Day (TPD) per plant (100 TPD cumulative).
Primary Feedstock
Paddy straw (70–75 tons/day/unit), supplemented by poultry waste and cattle dung.

Roadmap

We are executing our 10-unit plan in a phased approach to ensure operational stability

Phase I (2 Units)

Focused on initial sites like Wargal (Siddipet).

Phase II (4 Units)

Scaling the network across Telangana

Phase III (4 Units)

Completion of the 100 TPD Telangana cluster (Target Q3 2027).

Timeline

Timeline Carousel

Feb 2025

Incorporation

Oct 2025

First Offtake termsheet signed with GAIL

Feb 2026

Land Secured from Govt. of Telangana

March 2026

Second Offtake termsheet signed with Bhagyanagar Gas Ltd.

April 2026

Groundbreaking of 1st Phase

Feb 2025

Incorporation

Oct 2025

First Offtake termsheet signed with GAIL

Feb 2026

Land Secured from Govt. of Telangana

March 2026

Second Offtake termsheet signed with Bhagyanagar Gas Ltd.

April 2026

Groundbreaking of 1st Phase

Timeline

  • Incorporation

    Feb 2025

  • Oct 2025

    First Offtake termsheet signed with GAIL

  • Feb 2026

    Land Secured from Govt. of Telangana

  • March 2026

    Second Offtake termsheet signed With Bhagyanagar Gas Ltd.

  • April 2026

    Groundbreaking of 1st Phase

Technical Setup

Advanced anaerobic digestion for consistent biomass breakdown.
High-performance upgrading systems for superior gas purity.
Integrated waste handling for efficient processing and distribution.